Before you call about a metal roof in Alexandria, VA
In Old Town, Uptown and on designated hundred-year-old buildings, the City's Board of Architectural Review has written rules for exactly which metal roof may replace which. Seven things to settle before anyone prices the job.
Your checklist
Seven answers to have in hand, each with the City text behind it
- Which of the three BAR categories the building is inThe Old and Historic District, the Parker-Gray District, or a One Hundred Year Old Building. The last is a Council designation, so an old house is not automatically one. Outside the district lines, only designated buildings answer to the Board under Article 10-300 of the Zoning Ordinance.
- Whether the roof can be seen from a street or alleyThe administrative policy lists alterations not visible from a public right-of-way as needing no BAR approval, and says staff visit the property to judge visibility.
- The area you plan to replaceUnder 25 square feet of repair or in-kind work needs no review. Twenty-five or more goes to staff, and the Board only hears what staff refer to it. Full replacement of any material, in-kind included, normally gets staff review.
- What the roof is made of today: seam typeThe policy names three styles for original metal: standing seam, flat seam and stamped shingle. A replacement keeps the style.
- Whether the metal is original or a later swapA wood shingle roof that was replaced with standing seam metal or composition in the past may be replaced with standing seam metal or with wood shingles. Old photographs or a visible earlier layer settle this.
- If it is a Parker-Gray house, which document appliesA footnote in that policy sends residential Parker-Gray projects to the Residential Reference Guide and the adopted design guideline chapters instead. The policy itself covers the Old and Historic District and commercial uses in Parker-Gray.
- Whether the finish and gutters are on the tableGutters and downspouts need no BAR approval; the sheet recommends metal or wood, painted or factory finished to match the wall or trim.
Order of calls
Find out, ask staff, then decide on the panel
Find out
Look up the parcel on the City's historic preservation map viewer and gather photographs of the roof from the street side.
Ask
Historic Preservation staff answer at 703.746.3833. Ask for a written determination when you think the work is ordinary maintenance, as the policy suggests.
Decide
Only then compare panels. Pre-formed, pre-finished standing seam may stand in for field-installed seams if the seams and the metal pan are the same sizes; solid copper may replace painted standing seam.
Removal counts even when nothing visible changes
The City's page says a Permit to Demolish is needed for removing more than 25 square feet of material from a structure, whether or not it can be seen. Ask staff whether a metal tear-off falls under it before a date is set.
The Board's roofing sheets, identical for both districts, ask first for repair of original roofing. When staff find that impractical, matching material is the default; if the original cannot be determined, roofing fitting the building's style and period is used, and the Board discourages swapping original roofing for modern alterations. The same sheet dates standing seam to the mid-19th century in the districts and stamped metal shingle to the 19th century, which is why both are treated as historic styles. Staff can also supply a chart of historically appropriate roof colors.
For the City-level picture see our Alexandria roofing page, and for how metal systems differ see the metal section of the materials guide. Another review-driven roof is covered on our Falls Church TPO page and the Reston EPDM page.
FAQ
Metal roof questions that come up with the Alexandria BAR
Can a modern prefinished standing seam panel replace an old hand-seamed one?
The policy allows pre-formed, pre-finished standing seam to replace field-installed standing seam only if the seams and the metal pan are the same sizes.
My roof was wood shingle until someone put on standing seam. What goes back?
The policy says a wood shingle roof that was replaced with standing seam metal or composition in the past can be replaced with standing seam metal or wood shingles.
Is a flat seam roof the same as a standing seam roof for BAR purposes?
No. The policy lists standing seam, flat seam and stamped shingle as separate styles, and original metal is replaced with the same style.
Does a house outside the district boundary ever answer to the Board?
Yes, if Council designated it a One Hundred Year Old Building. The City's page says those are regulated under Article 10-300.
Which policy covers a Parker-Gray rowhouse roof?
A footnote sends residential Parker-Gray projects to the Residential Reference Guide and design guideline chapters. Confirm with staff which applies to your address.
Do gutters on a metal roof go through the Board?
The City's sheet says gutters and downspouts do not need BAR approval and recommends metal or wood in a painted or factory finish.
Official pages used, checked 2026-10-11: BAR roofing sheet, Old and Historic District, BAR roofing sheet, Parker-Gray District, BAR Policies for Administrative Approval, City historic districts page.
Talk through the next step
Talk through your roof with King's Roofing
Share the address, what you are seeing on the roof and the decision you need to make. We will tell you what to expect before anything is scheduled.
9220 Topaz St, Fairfax, VA 22031
Mon to Fri 7 AM to 8:30 PM, Sat 7 AM to 8 PM, closed Sunday