Brambleton: every replacement
The guidelines say Covenants Committee approval "is required for all roof replacements", even like for like. A change of material, they add, counts as significant as a change of color.
Loudoun County reviews no covenants, so in Ashburn Village and Brambleton the association decides first. Here are the dates, deadlines and exact roofing sentences from both, with the questions to send before anyone prices a metal roof.
The documents, in date order
The contents page of Brambleton's Design Guidelines marks this date on Additions/Alterations. That section says new roof materials must match the house "or be compatible (i.e. standing seam metal roof in a consistent color)". It is written for additions, not for replacing a whole roof.
Every page of the 76-page PDF carries this date. Its roofing paragraph says no AERC approval is needed for the same material, color, configuration and pitch, and that "any changes to roofing material, color, configuration or pitch are not permitted without prior AERC approval."
The design review page lists "Design Review Applications for Consideration" for that month, which shows the Covenants Committee is working on a monthly cycle now.
We read all 76 pages of the Ashburn Village guidelines: the roofing section never uses the word metal, which appears only for fences, railings and sheds. Brambleton's roofing section names asphalt shingles, and its two uses of metal roofing are the additions example above and a steel-to-shingle example below. Neither text says a metal replacement roof is allowed, or that it is refused. That decision sits with the committee.
The calendar of an application
Loudoun's permit page tells applicants to contact their homeowner or property owners association for additional approval. Brambleton adds that anyone in doubt should ask the Covenants Committee before proceeding.
Ashburn Village: 5:00 p.m. on the Friday before the next AERC meeting. Brambleton: 9:00 a.m. on the Friday ten days before a meeting held typically on the second Monday. A late application waits for the next meeting.
Ashburn Village posts results within two business days of the meeting and mails approvals; denials or letters with conditions go by signed-for mail. Brambleton's letters arrive 5 to 7 business days after the meeting.
Ashburn Village allows an appeal request within ten days of the AERC action, and says work must start within six months of approval and finish within 12 months.
Three details that change the plan
The guidelines say Covenants Committee approval "is required for all roof replacements", even like for like. A change of material, they add, counts as significant as a change of color.
Both documents say the entire structure is reroofed at one time. A partial job is allowed only if the new roofing exactly matches the existing roofing, which a metal slope on a shingle roof cannot do.
Ashburn Village says some properties have their own approved standards, and owners must meet them as well as the guidelines. Ask which apply to your street.
What Brambleton asks you to attach
Photographs of the house and roof; the manufacturer and the specific color name of the proposed roofing, plus a sample; if possible a sample of the existing roof; and the roofing colors of the adjacent neighbors. The same page says the committee will consider expediting applications in emergency situations.
FAQ
No. The roofing paragraph speaks of material, color, configuration and pitch without naming any material. A change to any of those needs prior AERC approval.
No. The phrase is an example of a compatible material for additions. The roofing section for replacements does not repeat it, so ask the committee about your house.
Yes. The guidelines require a design review application and committee approval for all roof replacements.
Its example of a significant material change is galvanized steel to asphalt shingles. It does not describe replacing steel with steel, so describe your roof in the application.
Both associations say to reroof the entire structure at once, and allow partial work only when it exactly matches the existing roof.
An appeal request is due within ten days of the AERC action, and a Board hearing can consider a variance with a written rationale. The Board's decision is final.
No. The county's permit page says applicants must still contact their association. Call 703-777-0220 for the county side.
Their roofing rules are outside what this page covers, so it cannot say what they allow. Ask each association before choosing a material.
The county counter, the housing mix and other Ashburn rules are on the Ashburn page. For how metal roofs are built, see the materials guide. Nearby: Leesburg and Sterling.
Official pages used, checked 2026-10-11: Ashburn Village AERC Guidelines, Brambleton Design Review, Brambleton Design Guidelines, Loudoun County, Permitting.
Talk through the next step
Give us the neighborhood name and whether the roof is shingle or metal today. We will say which association document to read first.
9220 Topaz St, Fairfax, VA 22031