A real piece, not a picture
The checklist wants labeled samples of every material and color, no bigger than 3 by 5 inches and not mounted on a board. Images and Pantone picks do not replace them, and Planning and Zoning keeps the samples.
Anyone asking whether Vienna allows a metal roof will not find a list of approved materials, because the Town says it does not keep one. What exists is a short chapter of the Town Code that judges a roof by its material and its roofline, and a board that meets once a month.
The paper trail
Read in the Town’s own pages on October 12, 2026. None of them names metal.
The design criteria in today’s section 4-15 trace back to this section of the 1962 Town Code. They ask whether a building is suitable for “a good suburban community” and weigh material, texture, color, roofline and height.
The history note under section 4-8 lists these ordinances. That section is the one that says plans must be approved before a structure in a district is “erected, reconstructed, altered or restored,” and that regular maintenance is outside the chapter.
The Board of Architectural Review exterior-modification checklist was last revised. It is where samples, manufacturer names and installation details come in.
Filing deadline for the Board’s November 19 meeting. The next one after that is November 25 for the December 17 meeting.
Section 4-15 asks about material, but it does not rank materials, and section 4-16 says the board “shall not adopt or impose any specific architectural style.” So a metal roof is neither named nor excluded. It is judged on how it looks next to its neighbors, and you carry the burden of showing that.
If your roof is covered
The order below is taken from the Board’s page.
The Town says not to apply to the board until site plan approvals and other zoning processes are finished. Staff tell you when the board application is appropriate.
The application goes in through the Town’s online portal, with product samples, about 21 days before the hearing.
Staff check zoning compliance and completeness and send comments back through the portal. Unanswered comments miss the deadline.
The board can approve, deny or approve with conditions, or ask for more information at a later meeting. Town building permit review follows, then the county permit.
The Board’s page says there is no expedited route, so plan any roof schedule around the monthly meeting.
Chapter 4 does not say whether replacing a roof is “regular maintenance” or an alteration. It does not say whether swapping shingles for standing seam changes the “exterior appearance” enough to fail the waiver test in section 4-8(b). The Town’s residential projects page lists roof height, not re-roofing. Treat each gap as a question for Planning and Zoning, not as permission.
Who it reaches
Section 4-2 draws the districts by use, not by street. It designates all land zoned for anything other than single family detached homes, plus any lot in a detached-home zone that is used for something else or is the subject of a permit application for another use.
The Census gives a rough sense of the buildings that could be involved, though it counts homes by structure and not by zoning. Of 5,818 homes in the Town, 1,262 (21.7 percent) are not detached houses. The count by size of building runs 597 attached, 383 in buildings of 5 to 9 units, 145 in 10 to 19, 77 in 20 to 49 and 20 in buildings of 50 or more (ACS 2024, 5-year).
Whether your townhouse group counts is a question for staff. For a detached house, start with the Vienna hub page.
Metal on the table
The checklist wants labeled samples of every material and color, no bigger than 3 by 5 inches and not mounted on a board. Images and Pantone picks do not replace them, and Planning and Zoning keeps the samples.
Each sample comes with manufacturer name, number, finish type and installation details. For metal, that means knowing the panel type and what fastens it before you file, not after. See how metal panels differ.
The 2021 International Building Code sets a minimum slope of one-quarter unit in 12 for standing-seam panels. Ask for the product’s own minimum against your roof’s real slope, and for clips and fasteners of a compatible metal.
FAQ
No. The Board of Architectural Review page says there are no specific design guidelines, recommended colors or materials for projects in the Town. The board applies the criteria in section 4-15 of the Town Code.
Several criteria use the word material, and two name roofline and height. One asks whether a design shows characteristics likely to deteriorate rapidly. None names metal, shingle or any other covering.
The Board’s page says no administrative or staff review is allowed under the Code. Staff check completeness and zoning, and the board votes.
The section exempts regular maintenance as opposed to reconstruction, alteration or restoration, and it treats a complete change of paint color as an alteration. It does not define roofing work, so ask Planning and Zoning how it treats yours before you order panels.
Section 4-8(b) lets the board waive the chapter after a hearing, where the work is reconstruction or alteration only and will not materially affect the exterior appearance. The board decides that, not the applicant.
No. Section 4-16 forbids the board and the Town Council on appeal from imposing any specific style when they administer the chapter.
The checklist encourages applicants for new construction or major exterior modifications to ask for a work session with the board before formal submission.
Official pages used
Checked October 12, 2026. Read them yourself before you plan work.
Related reading: metal roofing in Northern Virginia, the roofing materials comparison, and neighbors with their own metal pages, McLean and Fairfax.
Talk through the next step
Tell us what the building is, how the roof is shaped and what you want it to look like. A short phone call sorts out what to ask Town staff first.